UAT Support Consultant

Details

Status:
Gearchiveerd
Publicatiedatum:
3-6-2019
Weergaven:
80
Reacties:
3
Op locatie:
Arnhem
FTE:
40 uur per week

Opdrachtomschrijving

Voor onze directe eindklant in Arnhem is Harvey Nash op zoek naar een UAT Support Consultant (user Acceptance Testing)

Startdatum

03-06-2019 (ZSM)

Einddatum

01-10-2019

Duur

4 maanden

Inzet

40 uur

Beschrijving

  • In 2019 AkzoNobel will implement SAP Successfactors as their new HR talent suite. As part of the implementation, the configured solution will need to go through User Acceptance Testing and this is a crucial part in validating the configuration before brining live the system. 7 separate modules of the SuccessFactors system will need to be tested.

* The key activities of the UAT Support Consultant will be:
o During preparation the detailed test scripts for all modules need to be created based on high level scenarios, happy flow as well as unhappy flow for the end to end testing. Also managing the testers and setting up logistics to test like facilities and checking test accounts is part of this role. Some hands on smoke testing will also be required to evaluate testability of test cases and check readiness of system.
o During UAT execution this role will be making sure operationally everything goes as planned. This includes activities like helping testers with accounts and being SPOC for other issues
o Next to this the role should ensure appropriate engagement is there during UAT by testers, and highlight any large or blocking issues to streamleads. Also this role is responsible to create daily overview of UAT progress
* Experience with SAP SuccessFactors is preferred.
* Experience with Test Trail is preferred.
* The UAT Support Consultant will work closely with the Stream Leads for each module that is being implemented and will fall under the responsibility of the Program Manager.
* The required knowledge, skills and availability are not present in AkzoNobel.
* Working time and location will be defined by the project manager; the attendance of meetings only takes place when necessary for the execution of the assignment.
* The assignee can execute and deliver the assignment independently.
* The execution of the assignment is assessed on the quality and application of the above mentioned deliverables.

Verder kijken

Vergelijkbare open opdrachten